Page not found

Search results

  1. Lakeshore Drive Resurfacing (MDOT Project)

    City Engineer | Page

    (roadway) The Michigan Department of Transportation (MDOT) is resurfacing Lakeshore Drive within the City ... Display Contact Info Block Web Page Menu Settings Lakeshore Drive Resurfacing (MDOT Project) Sort A to Z ...

  2. Building Permit

    Building Inspection | Page

    NAME: ADDRESS: CITY: STATE: ZIP CODE: TELEPHONE NUMBER (INCLUDE AREA CODE): B. ARCHITECT OR ENGINEER ... Completion: Mandatory to obtain permit Penalty: Permit will not be issued I. PROJECT INFORMATION PROJECT NAME: ... : NAME: ADDRESS: CITY: STATE: ZIP CODE: TELEPHONE NUMBER (INCLUDE AREA CODE): LICENSE NUMBER: EXPIRATION ...

  3. What is the City's pavement preventive maintenance program?

    City Engineer | FAQ

    is left until it has failed and is then reconstructed.  City Engineer Street Resurfacing 0.00 ... The pavement preventive maintenance program is the name for the variety treatments the City uses ...

  4. 2024 Analysis

    City Assessor | Page

    76-0910-0019-00-6 912 LEWIS AVE 06/08/21 $196,000 WD 03-ARM'S LENGTH $196,000 $74,300 37.91 $197,037 $47,435 ... LENGTH $138,000 $52,000 37.68 $136,426 $50,197 $48,623 43.5 130.0 0.11 0.11 $1,154 $444,221 $10.20 38.00 ... 03-ARM'S LENGTH $210,000 $79,700 37.95 $211,483 $51,863 $53,346 47.7 130.0 0.13 0.13 $1,087 $405,180 $9.30 ...

  5. 2009 Report on Lake Boulevard Bluff Evaluation

    City Engineer | Page

    2009 PROJECT: LAKE BOULEVARD BLUFF EVALUATION LOCATION: ST. JOSEPH, MICHIGAN PHOTO NO. 37: Erosion due ... A study was conducted by Soil and Materials Engineers, Inc. in mid-July, 2009. This evaluation ... SME PROJECT NO.: KG59313 DATE: APRIL 29, 2009 PROJECT: LAKE BOULEVARD BLUFF EVALUATION LOCATION: ST. ...

  6. Howard Trail Bridge Temporary Closure

    Public Works | News/Press Release | Dec 1, 2023

    The Howard Trail Bridge will be closed for rehabilitation beginning Monday, December 4.  The City ... a three-year project to update the structure. ... press_release_for_immediate_release_howard_trail_bridge_closure-20231201.pdf Friday, December 1, 2023 Image Slideshow Display Contact Info Block Web Page News/Press Release ...

  7. Combined Sewer Overflow (CSO) Program

    City Engineer | Page

    program should be directed to City Engineer Tim Zebell. June 28 CSO Public Meeting Presentation ... Resurfacing Project Napier Ave: Langley Ave to Niles Ave, also Willa Drive: Napier Ave to Kingsley Ave 2013 ... Development stormwater detention area 2017 CSO Project Replace Sewer in PW, CIPP Line Sewer under Southshore ...

  8. Memorial Hall Repairs- Advertisement for Proposals

    Community | Bid/RFP

    project will be determined by the City Commission. The City reserves the right to reject any proposals or ... or email at mchristensen@sjcity.com. The City will only accept bids from contractors who make an ... original RFP. V. Instructions to Bidders Sealed bids are due at the St. Joseph City Clerk’s Office no later ...

  9. Historic Lighthouse/Catwalk Repairs

    Community | Bid/RFP

    selection of the bidder for this project will be determined by the City Commission. The City reserves the ... 269-930-4408 or email at mchristensen@sjcity.com. The City will only accept bids from bidders who make an ... RFP. V. Instructions to Bidders Sealed bids are due at the St. Joseph City Clerk’s Office no later than ...

  10. Langley Avenue Drain Repair Bid Tabulation

    City Clerk | Bid/RFP

     form. B & Z Company TOTAL Engineer's Estimate Compton Inc City of St. Joseph Engineering ...  form. TOTAL Engineer's Estimate Southwest Transport Co. City of St. Joseph Engineering ... Langley Avenue Drain Repair Bid Tabulation Image Slideshow Closed- no longer accepting bids and ...

Pages