Page not found

Search results

  1. Downtown St Joseph Facade Grant Program

    Downtown Development Authority | Page

    business co-owners: PROJECT INFORMATION Briefly describe the Scope of Work for the proposed project(s) that ... applicant is required to pay the total project cost up front, and request reimbursement for 50% of eligible ... past 45 days). For projects over $2,500, provide two (2) recent price quotes or bids for the proposed ...

  2. Street Programs

    Public Works | Page

    sign shop is also responsible for all of the Special Event and marketing signs seen throughout the City ... the City Engineer to address ongoing replacement of old and damaged sidewalk. The Department of Public ... and for signage at all of the City's buildings and grounds. In addition to the signs, the ...

  3. Milton Park Walking Path Renovation Project

    Parks & Recreation | Bid/RFP

    walking path at Milton Park as specified in the “Request for Proposals.” All proposals shall be submitted ... Proposals will be received until 3:00 p.m. on Tuesday, July 18, 2023 by the City of St. Joseph, at ... the City Clerk’s Office; 700 Broad Street, St. Joseph, MI 49085 at which time said proposals will be ...

  4. How bad does my sidewalk have to be before it needs to be replaced as part of this program?

    City Engineer | FAQ

    project regardless of which quadrant it is located in.  Sidewalks marked for repair have been identified ... will be marked with a white “X”. City Engineer Sidewalk Program 2.00 ... Under the City's current sidewalk program, sidewalks with a 1 inch difference present at any ...

  5. Hawthorne Lift Station Renovation Project

    City Engineer | Page

    Hawthorne Lift Station Renovation Project On August 14, 2023, the City Commission authorized ... dollars for the construction phase of the project with assistance from Abonmarche. The grant opportunity ... establishing that order was not without debate.  For example, at the time of project selection it was thought ...

  6. What if the sidewalk to be replaced is a part of my driveway, where will I park?

    City Engineer | FAQ

    Overnight, on-street parking will be allowed on City blocks impacted by the sidewalk project ... City Engineer Sidewalk Program 3.00 ... .  Concrete within the influence of a driveway should be allowed to cure for seven days before driving on it. ...

  7. Can I choose to do sidewalk repair work myself instead of participating in the City’s program?

    City Engineer | FAQ

    located in the Right-of-Way (ROW) you must obtain a ROW permit from the City Engineer in accordance with ... project starting.  The ROW permit application is available on the City’s website HERE or by contacting ... Assistant City Engineer Alex Austin in the Engineering Department (269-983-5541 or aaustin@sjcity.com). If ...

  8. 2024 Park Paving Project

    Community | Bid/RFP

    paving at two City-owned parks as specified in the “Request for Proposals.” All proposals shall be ... obtained from the St. Joseph City Clerk’s Office. Proposals are due by Tuesday, March 19, 2024 at 3:00 PM.  ... Submit bids in a sealed envelope labeled “Park Paving Project” and mail or deliver to the City Clerk’s ...

  9. Sidewalk Replacement Program

    City Engineer | Page

    City with each replacement projectFor more information on the please review the FAQs below or ... program administered by the City Engineering Department.  The program helps eliminate defective sidewalks ... Sidewalks are a very important means of travel for our residents, especially children and senior ...

  10. How are streets chosen to be resurfaced?

    City Engineer | FAQ

    When choosing a street to be part of a resurfacing project, the City looks at many variables ... to no history of maintenance being required. City Engineer Street Resurfacing 0.00 ... safety, and maintenance history among other things.  Roadways that are good candidates for resurfacing are ...

Pages