Page not found

Search results

  1. Asset Management Program

    City Engineer | Page

    Yes Orchard Ave Reconstruction X X X X 2020 Yes Kingsley Ave Reconstruction X X X X 2020 Yes Morton ... Project Napier Ave Niles Ave Langley Ave 36 Morton Ave Reconstruction Morton Ave Kingsley Ave Van Brunt ... Location To From 37 Kingsley Ave Reconstruction Kingsley Ave Morton Ave Langley Ave 38 Upton Dr ...

  2. 2017 Asset Management/SAW Grant Information

    City Engineer | Page

      The City was awarded a SAW Grant in October 2014 and retained Wade Trim in November 2014 to  provide professional services for the grant; the grant expires on October 31, 2017. The City ...  assets in the right‐of‐way. Much of the initial information was  available and compiled from previous City projects. A geographical information systems (GIS) file  had been developed for ... . Wade Trim updated the data using an inventory of available record drawings  and as‐builts completed in the City of St. Joseph. This included infrastructure projects as  well as road reconstruction projects. Project ...

  3. 2020 Kingsley, Orchard & Morton Reconstruction Project Professional Services Proposals

    City Clerk | Bid/RFP

    2020 Kingsley, Orchard & Morton Reconstruction Project Professional Services Proposals Image ... Settings 2020 Kingsley, Orchard & Morton Reconstruction Project Professional Services Proposals Sort ... Slideshow Closed- no longer accepting bids and proposals Display Contact Info Block Web Page Bid/RFP Menu ...

  4. Annual City Budget and Capital Improvement Plan

    Finance & Utility Billing | Page

    fiscal responsibility; the City of St. Joseph follows the following budget guidelines: • Except for the ... equipment and for their orderly systematic replacement. • The City will maintain a budgetary control system ... appropriated for the duration of the project. • Although not required by state law, internal service and ...

  5. Drinking Water State Revolving Fund (DWSRF) Loan Program

    City Engineer | Page

    lead services and street reconstruction. The impacts of the proposed project are expected to be the ... same as recent lead service line replacement and reconstruction projects in the City of St. Joseph. The ... available for inspection at the City of St. Joseph Engineering Department, 700 Broad Street, St. Joseph, MI ...

  6. 2025 Botham Avenue Reconstruction Project- Request for Proposals

    City Engineer | Bid/RFP

    City Clerk. REQUEST FOR PROPOSAL: PROFESSIONAL ENGINEERING SERVICES 2025 Botham Avenue Reconstruction ... FOR PROPOSAL: PROFESSIONAL ENGINEERING SERVICES 2025 Botham Avenue Reconstruction Project   CLOSING ... SERVICES 2025 Botham Avenue Reconstruction Project Section Page No. Request for Proposals Cover Proposal ...

  7. Kingsley, Morton & Orchard Reconstruction Project

    City Clerk | Bid/RFP

    Kingsley, Morton & Orchard Reconstruction Project Image Slideshow Closed- no longer accepting ... bids and proposals Display Contact Info Block Web Page Bid/RFP Menu Settings Kingsley, Morton & ... Orchard Reconstruction Project Sort A to Z ...

  8. Kingsley, Morton & Orchard Reconstruction Project

    City Clerk | Bid/RFP

    Kingsley, Morton & Orchard Reconstruction Project Image Slideshow Closed- no longer accepting ... bids and proposals Display Contact Info Block Web Page Bid/RFP Menu Settings Kingsley, Morton & ... Orchard Reconstruction Project Sort A to Z ...

  9. Professional Engineering Services 2022 SCIP Phase II

    City Engineer | Bid/RFP

    should be plainly marked: REQUEST FOR PROPOSAL: PROFESSIONAL ENGINEERING SERVICES 2022 SCIP Phase II ... FOR PROPOSALS PROFESSIONAL SERVICES The City of St. Joseph invites interested Consultants to submit ... at www.sjcity.com, or mailed by contacting the City Clerk. PROPOSAL INDEX PROFESSIONAL ENGINEERING ...

  10. 2016 Master Plan and Documents

    Planning & Zoning | Page

    Project incorporates a non- motorized path. Future projects (Langley, Kingsley, Morton, Orchard, etc.) ... 2019 (Wallace), 2020 (Kingsley/Orchard), 2021 Langley Langley Avenue completed in 2021, Willa Drive, ... proposed activity for 2017/2018 Goal: Assess and maintain the City’s existing infrastructure. Goal: ...

Pages