Page not found

Search results

  1. I-94 BL Lead Service Line Replacement Project

    City Engineer | Bid/RFP

    Base, 4 Inch 1050 SYD 10 Public Water Service, 1 Inch, Trenchless, Copper 2240 FT 11 Curb Stop and Box ... Trenchless, HDPE 3175 FT 15 Private Water Service, 1 Inch, Trenchless, Copper 90 FT 16 Private Water Service, ... Trenchless, Copper 90 FT 15 Private Water Service, 1 Inch, Connection to Existing 28 EA 16 Private Water ...

  2. Ways to Identify Different Pipe Material

    City Engineer | Page

    "flared". Tapping on the lead pipe with a metal object will produce a dull sound. Copper Pipe Copper is the ... Below are some helpful hints and photos to help you identify common water line materials. ... on galvanized pipe with a metal object will produce a metallic "clinging" noise. Lead Pipe ...

  3. FY 22 LSLR: High Lead Sample Results Project

    City Clerk | Bid/RFP

    12 Public Water Service, 1 Inch, Trenchless, Copper 1,505 FT 140.00$ 210,700.00$ 150.00$ 225,750.00$ ... 70.00$ 110,600.00$ 108% 16 Private Water Service, 1 Inch, Trenchless, Copper 110 FT 75.00$ 8,250.00$ ... FY 22 LSLR: High Lead Sample Results Project Image Slideshow Closed- no longer accepting bids and ...

  4. Asset Management Program

    City Engineer | Page

    Replacement SEWER LCR = Lead Copper Rule Projects Underway or Ongoing Year 2017 CIP? Project Description ... the right-of-way • Streets & storm sewers • Water distribution system • Sanitary sewer collection ... Manholes • Sanitary Pressurized Mains • Sanitary Lift Stations • Paved Streets • Storm Gravity Main • Water ...

  5. Water Service Line Point-of-Entry

    City Engineer | Page

    In 2018, the State of Michigan made significant changes to the Lead and Copper Rule (LCR) which ... gathering information on the privately owned portion of water services throughout the city. As part of that ... the point where the water service enters the building.  As part of this monumental endeavor, the city ...

  6. Water Filtration Plant Monthly Reports

    Water Treatment Plant | Page

    ACTIVITIES Lead & Copper Rule Compliance Monitoring Plant staff collected 21 samples in the City ... distribution system from homes meeting the Tier 1 definition under the Michigan Lead and Copper Rule. Tier ... 1 includes water service lines constructed in whole or in part of lead. Homeowner were asked to collected ...

  7. Water Main Permits

    City Engineer | Page

    specified for under the Water Main items. The carrier pipes shall be subject to the same tests as required ... all work necessary to construct complete water main that is ready for service and test the water main ... all test requirements for water main listed in this specification. Where the water main crosses ...

  8. Boil Water Advisory Lifted

    Community | News/Press Release, Alert

    portions of the St. Joseph water system on July 29, 2023, is lifted immediately.  Water quality testing ... News/Press Release Alert Menu Settings Boil Water Advisory Lifted Sort A to Z ... Boil Water Advisory Lifted as of August 1, 2023, 1:45 PM The Boil Water Advisory issued for ...

  9. Water Filtration Plant Monthly Reports for 2021

    Water Treatment Plant | Page

    more cost effective approach given EPA’s recent LCR (Lead and Copper Rule) revisions. Under the new ... an article for the Michigan Waterworks News entitled, A City Water Supply in 1896 which is reprinted ... one of the most complete systems in Michigan. The water has been carefully tested and it would be ...

  10. 2025 Botham Avenue Reconstruction Project- Request for Proposals

    City Engineer | Bid/RFP

    of Michigan Lead and Copper Rule. The Botham Avenue Reconstruction Project is included on the current ... the following pages.  In the event the Consultant is unable to submit such a proposal, the Consultant ... Departments will use this information to communicate with you in the event an addendum or change to this ...

Pages