FAQs
-
Roadways closures will be limited to the day of the installation of the fog seal. Typically the road will be closed after 8 am and will reopen in the evening.
-
In order to install crack seal the road will have what's called a rolling closure. This means the road will only be closed for a short duration in the immediate area of the work. The closure will travel with the crew installing the crack seal.