Page not found

Search results

  1. Water Filtration Plant Monthly Reports

    Water Treatment Plant | Page

    (Repaired/Replaced) Painted 100-150 hydrants in City (charged to 592 City Water Fund), Flushed deadends Valve Turning ... A to Z monthly_activity_report_august_2022.pdf CITY OF ST. JOSEPH WATER FILTRATION PLANT OPERATIONAL ... REPORT AUGUST 2022 Mission Statement WSJOB- The City and Authority working together to provide safe ...

  2. 2017 Asset Management/SAW Grant Information

    City Engineer | Page

     2014.  (Beginning in 2005, the City required all record drawings to be in State Plane  Coordinates.)  Sanitary System  ...  of St. Joseph invested its  own resources to expand the AMP to include the City’s water distribution system and roadway network  so ... contact:    Mr. Tim Zebell P.E., City Engineer     City of St. Joseph  700 Broad Street  ...

  3. Water Filtration Plant Monthly Reports for 2021

    Water Treatment Plant | Page

    The City and Authority working together to provide safe drinking water of the highest quality to all ... ranks 28th in the thirty year tabulation dating back to 1992. GENERAL ACTIVITIES SW Michigan Emergency ... Connection Control Service Retirement Service Replacement (Lead) 2 2616 Botham Court (City). Due to main ...

  4. Upton Drive Reconstruction Project

    City Engineer | Page

    City continues to experience combined sewer overflow (CSO) events, and foundation and roof drains ... improperly connected to the sanitary sewer increase the volume and duration of the events. The City will be ... the Upton Drive Reconstruction Project) B&Z Company informed the City that they intend to start ...

  5. I-94 BL Lead Service Line Replacement Project

    City Engineer | Page

    Right-of-Entry must be returned to the City of St. Joseph Engineering Department, 700 Broad Street, St. Joseph, ... The City awarded the I-94 BL Lead Service Line Replacement Project to B and Z Company out of ... Questions regarding the I-94 BL Lead Service Line Replacement Project should be directed to Assistant City ...

  6. Water System Reliabilty Study & General Plan

    City Engineer | Bid/RFP

    Address: The City of St. Joseph Engineering and Clerk Departments will use this information to communicate ... Questions regarding the scope of work to be accomplished may be directed to Tim Zebell, City Engineer at ... requires that an amendment be issued, contact the City Engineer for questions related to scope of work and ...

  7. Annual City Budget and Capital Improvement Plan

    Finance & Utility Billing | Page

    Page Categories Annual City Budget and Capital Improvement Plan Sort A to ... City will seek to maintain minimum reserve levels in all major funds. Minimum recommended reserve ... projects and capital improvements to City streets and highways. The Cemetery Fund (209) is used to account ...

  8. Asset Management Program

    City Engineer | Page

    2 Introductions Engineering Personnel • Tim Zebell, City Engineer • Alex Austin, Assistant City Engineer Public ... system including Lift Stations • The goal is to expand program to other City assets over time. Progress ... Location To From 37 Kingsley Ave Reconstruction Kingsley Ave Morton Ave Langley Ave 38 Upton Dr ...

  9. Notice of Public Meeting

    Water Treatment Plant | Page

    wastewater treatment services to the cities of Benton Harbor and St. Joseph, four surrounding townships, and ... method of determining the future population needs to consider each individual township and city. The ... Benton Harbor, St. Joseph Charter Township, and the City of St. Joseph are estimated to remain unchanged. ...

  10. Annual Fee Schedule

    Finance & Utility Billing | Page

    Non-profit rental per event $75.00 Off Season Rental- No Ice 3 CITY OF ST. JOSEPH 2023 FEE SCHEDULE Fee Type ... $2.00 Summer Season Parking, May 21 to September 10: Daily Parking- Monday thru Thursday excluding ... Days per hour $3.00 Late Season Parking, September 11 to September 30: Daily Parking- Monday thru ...

Pages