City Engineer: Tim Zebell
Address: 700 Broad Street
Phone: (269) 983-5541
Fax: (269) 985-0346
A Permit is required for work within the Right-of-Way. The Right-of-Way typically includes the street, tree lawn and sidewalk area in front of your property. Please refer to the Right-of-Way Permit application - at the link that follows - for additional details on the requirements.
Right of Way Application (PDF)
Please submit applications and supporting materials to Rhonda Fryer in the Inspections Department (269-983-1212, Fax: 269-985-0347, email: rfryer@sjcity.com) for processing.
Napier Langley Traffic Signal - Congestion Mitigation and Air Quality (CMAQ) Project
The new Napier Langley traffic signal is now operational and there is a change to the left signal mode of operation. The protected green arrow has been changed to a permissive/protected left turn. Please visit the link below if you have questions regarding the operation of the new signals.
http://www.michigan.gov/mdot/0,4616,7-151-9620_10694-157538--,00.html
Price Street Reconstruction Project
Construction on Price Street is substantially complete, the street is expected to be opened to traffic on May 17th, after the concrete pavement has adequately cured.
2013 CSO Project
On May 6th, the City Commission approved tentative award of the 2013 CSO Project to B&Z Company. The predominant source of funding for the project is a State Revolving Fund (SRF) low interest loan which requires tentative award of the project.
4/17/13 Bid Opening Results: http://sjcity.com/pdfs/2013%20CSO%20Bid%20Tabulation.pdf
West Highland Reconstruction Project
On May 6th, the City Commission approved award of the West Highland Reconstruction Project to Kalin Construction.
4/17/13 Bid Opening Results: http://sjcity.com/pdfs/West%20Highland%20Bid%20Tabulation.pdf


